PREMIER BUILDING COMMISSIONING
EIDOS provides over two decades of building envelope waterproofing oversight for owner throughout entire construction process – reviewing critical exterior assemblies before they become concealed and difficult to correct.
Our process establishes a clear standard of accountability between the design documents applicable building code, manufacturer requirements and field installation.
| ASSEMBLY | DOCUMENT | VERIFY | CORRECT |
|---|---|---|---|
| Roofing | Approved system + manufacturer requirements | Underlayment, flashing, penetrations, drainage + transitions | Document deficiencies and verify corrective work |
| Exterior Walls | Specified wall assembly + WRB requirements | WRB continuity, drainage, flashing + penetrations | Correct discontinuities before concealment |
| Vapor + Air Control | Required assembly + climate strategy | Material, location, continuity + transitions | Resolve gaps or improper installation |
| Windows | Manufacturer installation requirements | Sill pans, jambs, head flashing, attachment + WRB integration | Correct deviations before exterior finishes |
| Exterior Doors | Manufacturer details + specifications | Thresholds, flashing, attachment + waterproofing | Document and correct deficiencies |
| Exterior Finishes | Approved materials + installation requirements | Stone, stucco, siding, masonry + architectural metal | Verify installation protects drainage plane |
| Transitions | Architectural + manufacturer details | Roof-to-wall, window-to-wall, door-to-wall + foundation interfaces | Coordinate responsible trades and verify resolution |
| Penetrations | Approved flashing/sealing requirements | Utilities, vents, lighting + equipment penetrations | Correct compromised envelope conditions |
THE EIDOS ACCOUNTABILITY PROCESS
SPECIFICATION
↓
MANUFACTURER REQUIREMENT
↓
APPLICABLE CODE
↓
FIELD VERIFICATION
↓
DOCUMENTED DEVIATION
↓
RESPONSIBLE PARTY
↓
CORRECTIVE ACTION
↓
VERIFICATION BEFORE CONCEALMENT
PROTECT WHAT WILL NO LONGER BE VISIBLE.
Once stone, stucco, siding, roofing and interior finishes are installed, some of the home’s most important waterproofing details disappear.
EIDOS documents critical envelope conditions during construction—helping ensure that what was designed, specified, priced and approved is what the owner ultimately receives.
DOCUMENT → VERIFY → CORRECT → PROTECT